|
Working with his team,
JCA can imagine, study, design and make your project a reality.
|
How ?
|
Our fields of activity :
|
| |
By dialogue
By
reflective thinking
By adaptation
By analysis |
|
| Individual homes and collective
housing schemes |
| |
- Residential
- Lofts
- Private houses
- Private and social housing developments |
| Rehabilitation of industrial wasteland |
| |
- Appropriation, conversion and rehabilitation
of wasteland
- Design and promotion of a new business and lifestyle concept
in natural surroundings |
| Business premises |
| |
- Workshops craft centres
- Industrial
- Shops
- Offices
- Administrations |
| Educational establishments |
| |
From kindergartens to universities |
| Sports and leisure premises |
|
- Sports centres
- Diving centres
- Gymnasium
- Swimming pool
- Go-kart track
- Multimedia library
- Library |
|
|
|
|
| |
Prepare a diagnostic
Carry out a functional and economic analysis in close
consultation with those responsible for the project
Integrate concepts of spatial management to maximise
the use of the areas created in the building. |
|
Architecture :
|
|
| |
Ensure that the projects identity
matches its function by adapting ideas to the actual
construction work.
Create a unique design for each project. |
|
Building work :
|
|
| |
Organise the technical file in a way that
meets the specific needs of the project, integrating the necessary
studies carried out by approved engineering firms1
Prepare the administrative paperwork so that it is ready
when required
Supervise and inspect the work to meet the following
objectives |
|
| |
|
- Quality
- Competition times
- Budget
- Financial management |
|
| |